DR-LI - Coastal Baseline Region
San Diego Gas & Electric Co · Time-of-use + tiered · filed 2026
What this tariff charges
| Fixed charge | $6.00 per month |
|---|---|
| Structure | Time-of-use + tiered |
| Filed | 2026-06-01 |
Energy rates
The charged price is the base rate plus its adjustment. Adjustments carry fuel and rider costs and are frequently most of the bill, so a comparison built on the base rate alone is meaningless.
Period 0
| Tier | Up to | Base | Adjustment | Charged $/kWh |
|---|---|---|---|---|
| 1 | 11.7 kWh daily | 0.40559 | 0.00000 | 0.40559 |
| 2 | no limit | 0.51222 | 0.00000 | 0.51222 |
Period 1
| Tier | Up to | Base | Adjustment | Charged $/kWh |
|---|---|---|---|---|
| 1 | 11.96 kWh daily | 0.40559 | 0.00000 | 0.40559 |
| 2 | no limit | 0.51222 | 0.00000 | 0.51222 |
What it costs at different usage levels
| kWh per month | Annual total | Effective $/kWh |
|---|---|---|
| 500 | $2,684.03 | $0.4473 |
| 1000 | $5,757.35 | $0.4798 |
| 2000 | $11,903.99 | $0.4960 |
Effective rate includes the fixed charge, which is why it falls as usage rises. This is a time-of-use tariff, so the result also depends on when power is used; an average residential pattern is assumed. Details →
Rooftop solar on this tariff
A 7 kW system costing $21,000 before incentives would save between $2,703 and $5,570 a year on this tariff, paying back in 4–8 years . No federal tax credit is included: Section 25D ended on December 31, 2025.
no sell rate filed, but this utility reports residential net metering - the range spans no export credit to full retail netting. Compare across this state →
The utility's own description
Those are the CARE rates associated with service under Schedule DR. Schedule DR is SDG&E's standard UDC schedule for domestic residential electric service.
URDB rate id 6a457387e42ed4afbd0ab57b · all San Diego Gas & Electric Co tariffs