E-15 Tier 3 CUSTOMER GENERATION AVERAGE DEMAND PRICE PLAN FOR RESIDENTIAL SERVICE (Amp Service 225+)
Salt River Project · Time-of-use · filed 2026
What this tariff charges
Fixed charge
$40.00 per month
Structure
Time-of-use
Filed
2026-01-01
Energy rates
The charged price is the base rate plus its adjustment. Adjustments carry fuel
and rider costs and are frequently most of the bill, so a comparison built on the base
rate alone is meaningless.
Period 0
Tier
Up to
Base
Adjustment
Charged $/kWh
1
no limit
0.05610
0.00000
0.05610
Period 1
Tier
Up to
Base
Adjustment
Charged $/kWh
1
no limit
0.06630
0.00000
0.06630
Period 2
Tier
Up to
Base
Adjustment
Charged $/kWh
1
no limit
0.06130
0.00000
0.06130
Period 3
Tier
Up to
Base
Adjustment
Charged $/kWh
1
no limit
0.08230
0.00000
0.08230
Period 4
Tier
Up to
Base
Adjustment
Charged $/kWh
1
no limit
0.06340
0.00000
0.06340
Period 5
Tier
Up to
Base
Adjustment
Charged $/kWh
1
no limit
0.06740
0.00000
0.06740
Not priced. has demand charges (needs kW, not just kWh). The tariff is shown as filed
rather than paired with an estimate we cannot stand behind.
The utility's own description
Service under this price plan is limited to residential customers with on-site generation who do not purchase all of their energy requirements from SRP. This plan is applicable to a single family house, a single unit in a multiple family house, a single unit in a multiple apartment, a manufactured housing unit, or other residential dwelling, where the on-site generation is installed. Service is supplied through one point of delivery and measured through one meter. Service under this price plan excludes resale, sub-metering and standby uses. 1) Tier 1: Applies to a single unit in a multiple family house, an apartment unit, a condominium unit, a townhouse, or a patio home, with service of 0-225 amps. 2) Tier 2: Applies to any dwelling type to which Tier 1 is not applicable, with service of 0-225 amps. 3) Tier 3: Applies to any residence with service of more than 225 amps.