A-TOU Residential Service - Time-of-Use

Central Maine Power Co · Time-of-use · filed 2026

$0.1732per kWh, all in
$2,078a year at 1,000 kWh/mo
$26.71fixed, before any usage
$0.2237utility's actual average

What this tariff charges

Fixed charge$26.71 per month
Minimum charge$26.71 per month
StructureTime-of-use
Filed2026-01-01

Energy rates

The charged price is the base rate plus its adjustment. Adjustments carry fuel and rider costs and are frequently most of the bill, so a comparison built on the base rate alone is meaningless.

Period 0

TierUp toBase AdjustmentCharged $/kWh
1 no limit 0.50314 0.00000 0.50314

Period 1

TierUp toBase AdjustmentCharged $/kWh
1 no limit 0.06745 0.00000 0.06745

What it costs at different usage levels

kWh per monthAnnual total Effective $/kWh
500 $1,199.26 $0.1999
1000 $2,077.99 $0.1732
2000 $3,835.46 $0.1598

Effective rate includes the fixed charge, which is why it falls as usage rises. This is a time-of-use tariff, so the result also depends on when power is used; an average residential pattern is assumed. Details →

Central Maine Power Co offers a cheaper tariff at this usage. A-TOU-OPTS Residential Service - Optional Time-Of-Use (Super Saver) comes to $1,356.42 a year against this one's $2,077.99 — a difference of $722. Eligibility rules may apply; check with the utility.

Rooftop solar on this tariff

A 7 kW system costing $21,000 before incentives would save between $46 and $1,077 a year on this tariff, paying back in 19–454 years . No federal tax credit is included: Section 25D ended on December 31, 2025.

no sell rate filed, but this utility reports residential net metering - the range spans no export credit to full retail netting. Compare across this state →

The utility's own description

AVAILABILITY This rate is available for Residential Service taken on a continuous year-round basis at one point of delivery, except that service may be taken for a shorter period subject to the provisions of the short-term service charge. CHARACTER OF SERVICE End use service will be single phase, alternating current, 60 hertz, furnished at one standard secondary distribution voltage as described in the Company's Handbook of Requirements for Electric Service and Meter Installations.

URDB rate id 6993c8de530d515912068248 · utility source document · all Central Maine Power Co tariffs